What’s New?
- Cost Section Arrow Indicators
The Scheduling module now displays visual directional indicators alongside labour vs. sales budget totals. Previously, budget performance was conveyed through colour alone (green for under budget, red for over budget), which was inaccessible to users with colour vision deficiencies
↓ The down arrow is displayed when labour costs are at or below budget
↑ The up arrow is displayed when labour costs are above budget
This is seen in the summarised view of the cost allocation (Fig.1) and in the more detailed report (Fig.2).
Release date: 19th May 2026
Comments
Please sign in to leave a comment.