Is there a way to set up a shift type that will not feed into budgets on the rota?
Have a shift type that is set up with a shift value of 0 however its pulling through the hours in to the wage forecast budget.
Is there another way to do this? Or is this even possible?
Thanks! :)
Download Our App
Comments