In the Tronc 2 module it is impossible to see if each site’s tronc is closed without going into each one manually. Can you please let us know how we can monitor open/closed troncs with on a summary screen.
E.g. like the rota module shows when rotas are left open.
In the Tronc 2 module it is impossible t ...
0 votes
Linked Ideas
Hi @Thomas Gold
The easiest way to review the status of Tronc2 funds is to run Reports > Employee Tronc: Locations = All, Options = Detailed. remember that that tronc periods run from midnight to midnight, so your date range has to be midnight from the first day to midnight of the day following the last day of the period (e.g. if your tronc period is Monday 2nd March to Sunday 8th March 2020, your date range must be 2nd march 2020 0000 to 9th March 2020 0000).
If you run the report, it will export indicate "Status" as the last column. Any "*" (asterisk) present, will indicate employees within a fund that is still open.
I hope this helps.
Cheers!
Please sign in to leave a comment.
Download Our App
Comments