Scheduling contains functionality that allows the creation and maintenance of external employment agencies, contracts, and agency staff, should they be used within a customer's employment structure. Contractor hourly rates can be used to forecast labour costs for external agency staff.
Please note - this functionality applies to the following versions:
Labour-Based Scheduling - 2023 version
Revenue-Based Scheduling (Demand Scheduling) - 2023 version
Activity-Based Scheduling (Enterprise) - 2023 version
Activity-Based Scheduling (Performance) - 2023 version
Organisation Setting
An organisation setting needs to be applied by a system administrator.
- The setting can be found under Settings > Manage Organisation
- Tick the box under Use Contractor Companies?
Fig.1 - Contractor Organisation Setting
A user-level permission can then be applied to allow users to manage the Agency Management section of the solution.
- Go to Settings > User Levels
- Select Edit against the required User Level
- Tick the box against Create and Edit Contractors, scroll down and then Save
Creating an Agency
A user with the above permission can then:
- Select Agency Management Settings > Agencies
Fig.2 - Agency Management Settings
- Select Create New
-
Enter the required Agency information
- Name - Agency name
- Foreign ID - Agency ID
- Address 1-4 & Postcode - Agency company address
- Inactive - Status of Agency- Active/Inactive
- Billing Cycle - Billing cycle Weekly/Bi-Weekly/Monthly
- Billing Contact Details - Agency contact information, email/phone
- Once populated select Save
The Agency will then be listed. The 'Inactive' field determines if the Agency is active or not.
- If no longer working with an Agency, this can be set to Yes (by using the Edit button)
Fig.3 - Agency list - 'Inactive' set to 'No'
Creating Contracts
Once an Agency has been configured, a contract can be assigned to it. A contract can be assigned to one or more locations and can only be created if an Agency exists.
- Select Agency Management > Contracts > Create New
-
Enter the required contract information
- Contract ID - The ID of the contract
- Agency ID - Drop-down list of Agencies that are configured for the portal that will link the contract back to the correct Agency
- Contract External Reference ID - External ID (can be blank)
- Start Date - Start date of the contract
-
End Date - The date the contract ends
- Shifts can only be scheduled for Agency staff within the start/end dates
- Status - Review/Approved/Expired
- Location Selector - The contract can be assigned to one or more locations within the portal
- Once populated select Save
Fig.5 - Creating Contracts
Once saved, the contract will be displayed within the contract table.
Creating Contract Rates
Once a contract has been configured, contract rates can be set up for certain job roles. Different job role hourly rates can also be assigned to different locations.
- Select Agency Management > Contract Rates > Create New
-
Enter the required contract rate information
- Contract ID - Drop-down list of contracts that are configured for the portal
- Role - The Job Role the contract is for, choose from drop down list
- Hourly Rate - Hourly pay rate to for agency staff from this Agency company contract
- Description - Description for reference (can be blank)
- Location Selector - The contract can be assigned to one or more locations within the portal
- Select Save once complete
Fig.6 - Create Contract Rates
Creating Contractor Shifts
Once contract rates have been assigned, the hourly rate will be used to calculate the contractor shift costs. When users are scheduling contractor shifts they will be able to view the hourly rates assigned to each agency.
- To schedule a contractor shift, use the + symbol on the Job Role line to enter the shift as usual
Fig.7 - Create Contractor Shift - Activity Based Scheduling
Fig.8 - Create Contractor Shift - Revenue Based Scheduling / Labour Based Scheduling
All approved contracts will appear in the Select contractor drop-down (see Fig.8) within the start and end date of the contract.
Fig.9 - Creating contractor shifts
Comments
0 comments
Please sign in to leave a comment.